Hardware component selection
The hardware components need to be considered for the following elements
- 5G Network
- WIFI
- LoraWAN
- Satellite
- NQM Servers
These represent the physical hardware dependencies of the project
5G Network
-
4 uts. Dell PowerEdge R740
-
Containing: (AWTS /Amarisoft Integration)
-
5G full Stack Solution
-
3 uts. CPRI cards (6 GBIC bays each)
-
800 GB HD
-
-
1 ut SD-WAN Core Switch EdgeCore (Switch)
-
1 ut. Amarisoft CallBOX (PicoCell)
-
1 ut. Amarisoft User Equipment Simulator
Radio Heads
-
10 Uts. of AW2S Black Hawk n77 band 43 dBm 5G Radioheads
-
10 uts. of AW2S Black Hawk B3 band 4G Radioheads
Public WI FI
-
4 uts. cnMatrix TX2028RF-P
-
4 uts. Unifi EdgeSwitch12
-
26 units of Cambium e700 Enterprise Access Points
-
37 uts. Cambium XV2-T0 and XE3 Outdoor Access Points.
-
Mikrotik RouterBoard R760
LoraWAN
-
1ut. The Things Network Gateway
-
1ut. Weather Station Sensor SenseCAP S900 + Data Logger S2100
Satellite
For the Satellite experiments we will be using StarlinQ
https://www.starlink.com/gb/specifications?spec=4
No additional equipment is needed.
NQM Servers
NquiringMinds servers will be run "in house" on commodity server
We have selected Dell PowerEdge R350 as the target hardware, due to its ubiquity and solid support
https://i.dell.com/sites/csdocuments/Product_Docs/en/Dell-EMC-PowerEdge-R350-Spec-sheet.pdf
Although this is the target hardware, the software is designed so it can run on almost any hardware or cloud deployment